New website

Sales Hotline
400-8017106

New website

Current location:Home>News > Company dynamics >
A labourer's holiday
time:2018-05-01 10:45  

Pay tribute to the staff who stick to their posts during the May Day.

    "May 1" small holiday, choose to rest or go out to relax?

    Hangzhou RUNPAQ Energy Equipment Co., Ltd. front-line staff, in order to rush to make orders, resolutely stick to their posts and work seriously. The production workshop is still busy and sweats with great achievements.

    I work, I am glorious! Xiaobian walked into the workshop, felt the hardship of labor and shared the joy of labor. Let's say "hard work" to the lovely and respectable workmen.

    The small master of the material group is small and the responsibility is very big. Every day, how to make the best use of every piece of steel plate is the knowledge he should think about every day!

   

    In the welding workshop, the welder is seriously welding the weld, and after welding, the slag must be removed, and the sound of beating is repeated from time to time in the workshop. Although the temperature is not high, sweat has already soaked heavy work clothes.

    Electrical group colleagues, wiring assembly for a moment, strict compliance with the technical requirements, tighten each screw, after the factory commissioning, the equipment can be safely carried to the site of the project.
    Every boiler out of the factory can not be separated from the efforts of the employees, and the growth of each employee can not be separated from the development of the enterprise.

 

HANGZHOU RUNPAQ ENERGY EQUIPMENT CO.,LTD
About|Product Center|News|Achievement|Contact
Record number: No. 06012579 -2, Zhejiang ICP
Copyright@2018 RUNPAQ ENERGY All Right Reserved.
RUNPAQ ENERGY