New website

Sales Hotline
400-8017106

New website

Current location:Home>News > Company dynamics >
What's so delicious?
time:2018-07-24 11:43  

Zhejiang Huangyan thermal power plant, Hua Yuan frontline auxiliary boiler on-site office, a trouser leg, working shoes with dusty glasses brothers, is fast to the mouth to deliver the noodles, see his big mouth to eat so fragrant, let the people can not help but think, is this a special secret recipe, it has this fragrance.

It's so fragrant, it's a secret recipe. This eyeglasses brother is Wu Yuyan, manager of RUNPAQ Huayuan front boiler project. The secret recipe is to work continuously for 8 hours without eating.
In May 3, 2018, the Huangyan thermal power supply limit was less than 2 months, but the site did not have the construction conditions for the boiler in place. The second project manager of the project center, Wen Xian Wen, made a break: "first send the boiler to the site, and I will coordinate the cross operation of the boiler installation and other civil engineering, and strive for the project as scheduled." It's your time.
When the boiler equipment arrived at the scene, project manager Wu Yuyan urgently dealt with the leveling of the site.
(ontological completion)
Then, coordination pipe ditch construction, ground surface construction, boiler room construction and boiler equipment installation cross work, almost 24 hours rotation, the average work of 12 hours a month, project group members Hu Miaoqing, Zhu Lin Hui, Lin bolt, Zhang Meng and so on often eat a bowl of noodles to eat the fragrance of abalone.
Innumerable night, far can see the boiler installation scene light light, during the period, the construction site is uneven, steel four, the band is a necessary one of the following line:

(Wen Xinawen posted the wound sticker. The smile seemed to have done a foot massage and continued on the construction site).
A "fight" will inevitably occur during the rush hour of the cross work, for example, when the boiler chimney is not in place before the boiler chimney is in position, it will increase the difficulty coefficient for the boiler chimney position, and the chimney is only able to take subsection hoisting.
At the same time, the unloading and installation work of boiler auxiliaries, fans, pumps, superheater and burner is also carried out at the same time:
(in burner installation)
Once the equipment is in place, the commissioning work of the monomer will be carried out in all directions. The members of the project team took turns, and remained at their posts in the early hours of the morning.

 (debug in progress)
The debugging of the burner is the most difficult. This project adopts a new type of imported low nitrogen burner. Under the condition that the burner manufacturer cannot provide the key technical data, Sheng Xin, Lin bolt and Wang Feng of our field electrical debugging engineer change the air frequency, the opening of the air door, and find out the intake air volume. The joint ratio, the successful ignition.

(field flame stable combustion)
After 72 hours of drying, all members of the commissioning group were on duty for 24 hours until the drying oven was successfully completed.
72 hours of continuous operation, the data are close to perfect.
After the completion of the start-up boiler room, Huangyan thermoelectric has become the value of responsibility.
Zhejiang Huangyan thermal power EPC project group, is such a team, they struggle in the coal to gas heating boiler renovation site, self pressurization, construction period, before the environmental protection deadline, the smooth completion of the transformation task, the lens focus of them, make us proud! The leaders of the Huangyan thermal power group visited the centralized control room to thank RUNPAQ for all their hard work.

(second rows from right to left are: Chairman of Huangyan: Jin Dong, director of Supervision: Geng general, deputy general of Huangyan infrastructure: Xu general; the middle of the first row is Wen Xianwen, the project manager)

The power plant gives us full trust and is full of words in the commendation letter:
So far, RUNPAQ two 50 ton gas fired heating boilers have been successfully put into operation, and will continuously deliver high quality steam to more than forty enterprises in Huangyan economic development zone. This is the gift project that the staff of Huayuan front line ate with delicious noodles.

HANGZHOU RUNPAQ ENERGY EQUIPMENT CO.,LTD
About|Product Center|News|Achievement|Contact
Record number: No. 06012579 -2, Zhejiang ICP
Copyright@2018 RUNPAQ ENERGY All Right Reserved.
RUNPAQ ENERGY